Skip to content

CONCERTO Month-3 lock-priority report

TL;DR — Recommendation

Recommendation: Defer — Stage 1b not yet measured (Phase-1 milestone; guardrail ≤4 weeks)

Surviving axes (ADR-007 staging order): (none yet). ADR-008 HRS bundle: hold — surviving headline-axis set < 3 (re-check ADR-008 §Decision).

Per-axis evidence (≥20 pp gap test)

Axis Stage Status n_seeds n_episodes gap_iqm_pp ci_low_pp ci_high_pp gate_pass
AS 1a Stage 1a (rig-only) 5 200 n/a n/a n/a n/a
OM 1a Stage 1a (rig-only) 5 200 n/a n/a n/a n/a
CR 2 Missing n/a n/a n/a n/a n/a n/a
CM 2 Missing n/a n/a n/a n/a n/a n/a
PF 3 Missing n/a n/a n/a n/a n/a n/a
SA 3 Missing n/a n/a n/a n/a n/a n/a

Per-stage gate enumeration

Stage 1b

Stage 1b gate: deferred — no Stage-1b SpikeRun present.

  • AS — Stage 1a (rig validation only; no ≥20 pp measurement)
  • OM — Stage 1a (rig validation only; no ≥20 pp measurement)

Stage 2 launch: BLOCKED — Stage 1b not measured (ADR-007 §Stage 1b guardrail: launch ≤4 weeks after Month-3 lock).

Stage 2

Stage 2 gate: deferred — no Stage-2 SpikeRun present.

  • CR — Missing
  • CM — Missing

Stage 3 launch: deferred — Stage 2 not measured.

Stage 3

Stage 3 gate: deferred — no Stage-3 SpikeRun present.

  • PF — Missing
  • SA — Missing

Month-3 lock launch: deferred — Stage 3 not measured.

ADR-by-ADR action

ADR Action Rationale
ADR-007 Hold at Accepted; Stage 1b launch is Phase-1 milestone (§Stage 1b guardrail) Implementation staging gates; §Validation criteria threshold (≥20 pp).
ADR-008 Hold bundle lock — insufficient evidence §Decision default headline bundle CM x PF x CR; Option A / Option B fallbacks.
ADR-011 Hold baseline-set lock — §Validation coverage check not satisfied Baseline-set lock contingent on per-axis evidence for the surviving axes.

ADR-014 safety-table integration

SA spike not present — three-table safety report deferred to Stage 3 launch (ADR-014 §Decision unchanged).

Open-work flags (ADR-INDEX)

  • (b) ADR-007 §Stage 1a / §Stage 1b split. Stage 1b pending; flag remains active until Phase-1 launch (ADR-007 §Stage 1b guardrail: ≤4 weeks after Month-3 lock review).
  • (c) ADR-008 HRS bundle composition. Bundle composition pending the surviving-axis set (§Decision footnote c).
  • (f) ADR-014 safety reporting. Reporting contract qualified by ADR-008 bundle composition (flag c above) and the PR-A2 conformal-loss instrumentation; per-axis row counts firm up once Stage 3 SA lands.

Provenance

  • chamber version: 0.6.0
  • git SHA: b3a5cb2d10d686f60863583fccf85a297fafd928
  • timestamp (UTC): 2026-05-17T11:43:12.291751+00:00
  • gate threshold (pp): 20.00
  • bootstrap n_resamples: 2000
  • bootstrap root seed: 0
  • per-axis archives:
  • ASspikes/results/stage1-AS-20260517/spike_as.json (prereg_sha=29e397a4a012813c58fd4a0c3077ea8c754affc8, git_tag=prereg-stage1-AS-2026-05-15)
  • OMspikes/results/stage1-OM-20260517/spike_om.json (prereg_sha=9fad74738b56d4e067ea8bb29c60ef9f652b5b68, git_tag=prereg-stage1-OM-2026-05-15)